Koppers: Follansbee Plant
Overview
The Koppers Follansbee Plant represents one of the most compelling heavy-industrial redevelopment opportunities in the Upper Ohio Valley. Situated at 810 Koppers Road in Follansbee, Brooke County, West Virginia, this fully infrastructure-loaded complex sits directly on the Ohio River (milepost 69.3L) with immediate access to WV Route 2 and trimodal transport via road, Norfolk Southern rail, and navigable waterway.
The facility's 33-acre Koppers plant footprint is complemented by the adjacent 80-acre Trimodal Terminal Site to the south, creating a combined ~113-acre assemblage with contiguous Ohio River frontage. The Koppers plant itself is a fully built-out chemical distillation complex — operating since 1914 — with process equipment, boiler infrastructure, wastewater treatment, 13 buildings, and a certified river dock already in place. The Trimodal parcel adds cleared, divisible brownfield land ready for new development.
Together, this site offers something increasingly rare: existing heavy industrial infrastructure, scalable utility capacity, and multimodal logistics — all within a single contiguous property. It is well suited for chemical manufacturing continuation, energy transition projects, industrial redevelopment, or advanced manufacturing, and sits in a federally designated Opportunity Zone with brownfield incentives already established.


[ Click image to enlarge]
Project Details
Location:
810 Koppers Road / 600 Veterans Drive, Follansbee, WV (Brooke County)
Size:
~33 acres (built-out industrial facility)
~80 acres (brownfield/vacant land, divisible to 1 acre)
Combined ~113 contiguous acres
On-Site Power
Industrial Process/Manufacturing
• Fully operational coal tar distillation and chemical refining complex since 1914
• Distillation capacity: multiple stills rated 60–110 gpm; total plant capacity up to 345M lbs/yr distilled (2014)
• Products: refined chemical oil, naphthalene, distillate oils, carbon pitch, creosote blend
• Boiler House: three boilers, 120,000 lbs/hr steam capacity; 89% natural gas / 11% process solvent fuel
Water
• Cooling Water: Source – Ohio River
• Potable: Municipal – City of Follansbee Water Dept
• Wastewater Treatment / Sewer: On-site biological treatment plant, 350,000 GPD permitted. Municipal sewer adjacent to the Trimodal parcel
Fiber
• Providers: Frontier (local) / Verizon (long distance) at Koppers site
• Trimodal parcel: Frontier & Comcast; fiber available to site
• Broadband connectivity supports industrial controls and data infrastructure buildout
Natural Gas Infrastructure
• On-site pipeline: Direct Energy / Mountaineer Gas Company
• 6-inch gas main, 156 ft to plant, pressure: 38 PSIG (Koppers site)
• 3-inch line on Trimodal parcel; estimated load: 100,000 cubic feet per hour
• Natural gas supplies ~89% of annual boiler fuel input; remainder from process solvent
Environmental Next Steps
• The Koppers / Trimodal assemblage supports phased development, leveraging existing infrastructure and ongoing environmental and permitting activities. The Trimodal parcel has received a WVDEP Certificate of Completion under the Voluntary Remediation Program.
• Conceptual Environmental Desktop Review available
• The site is located in a federally designated Opportunity Zone, offering significant tax incentives for qualified investors
• Brownfield designation provides opportunities for remediation incentives and streamlined development pathways
