Koppers: Follansbee Plant

Overview

The Koppers Follansbee Plant represents one of the most compelling heavy-industrial redevelopment opportunities in the Upper Ohio Valley. Situated at 810 Koppers Road in Follansbee, Brooke County, West Virginia, this fully infrastructure-loaded complex sits directly on the Ohio River (milepost 69.3L) with immediate access to WV Route 2 and trimodal transport via road, Norfolk Southern rail, and navigable waterway.

The facility's 33-acre Koppers plant footprint is complemented by the adjacent 80-acre Trimodal Terminal Site to the south, creating a combined ~113-acre assemblage with contiguous Ohio River frontage. The Koppers plant itself is a fully built-out chemical distillation complex — operating since 1914 — with process equipment, boiler infrastructure, wastewater treatment, 13 buildings, and a certified river dock already in place. The Trimodal parcel adds cleared, divisible brownfield land ready for new development.

Together, this site offers something increasingly rare: existing heavy industrial infrastructure, scalable utility capacity, and multimodal logistics — all within a single contiguous property. It is well suited for chemical manufacturing continuation, energy transition projects, industrial redevelopment, or advanced manufacturing, and sits in a federally designated Opportunity Zone with brownfield incentives already established.

The image depicts an industrial complex with towering smokestacks against a clear, blue sky.
An annotated arial map of the Koppers Follansbee Plant Datacenter Site
An annotated arial map of the Koppers Follansbee Plant Datacenter Site
An annotated arial map of the Koppers Follansbee Plant Datacenter Site
An arial view of an industrial plant showing an array of industrial equipment next to a large waterway

[ Click image to enlarge]

Project Details

Location:
810 Koppers Road / 600 Veterans Drive, Follansbee, WV (Brooke County)

Size:
~33 acres (built-out industrial facility)
 ~80 acres (brownfield/vacant land, divisible to 1 acre)

Combined ~113 contiguous acres

On-Site Power

Power Available (Now Power): 100MW

Electric Provider: Mon Power (AEP subsidiary)

  • On-site voltage: 24,000V stepped down to 2,400V, 3-phase

  • Substation within 1,000 feet of the Trimodal Terminal parcel

  • 10 MVA – 50 MVA service available (scalable for industrial or data center use)

Natural Gas Provider: Direct Energy / Mountaineer Gas Company

  • 6-inch gas main on Koppers Site, pressure: 38 PSIG

  • Trimodal parcel: 3-inch line with an estimated load of 100,000 cubic feet per hour 

Power Available (Now Power): 100MW

Electric Provider: Mon Power (AEP subsidiary)

  • On-site voltage: 24,000V stepped down to 2,400V, 3-phase

  • Substation within 1,000 feet of the Trimodal Terminal parcel

  • 10 MVA – 50 MVA service available (scalable for industrial or data center use)

Natural Gas Provider: Direct Energy / Mountaineer Gas Company

  • 6-inch gas main on Koppers Site, pressure: 38 PSIG

  • Trimodal parcel: 3-inch line with an estimated load of 100,000 cubic feet per hour 

Industrial Process/Manufacturing

• Fully operational coal tar distillation and chemical refining complex since 1914
• Distillation capacity: multiple stills rated 60–110 gpm; total plant capacity up to 345M lbs/yr distilled (2014)
• Products: refined chemical oil, naphthalene, distillate oils, carbon pitch, creosote blend
• Boiler House: three boilers, 120,000 lbs/hr steam capacity; 89% natural gas / 11% process solvent fuel 

Water

Cooling Water: Source – Ohio River
Potable: Municipal – City of Follansbee Water Dept
Wastewater Treatment / Sewer: On-site biological treatment plant, 350,000 GPD permitted. Municipal sewer adjacent to the Trimodal parcel

Fiber

• Providers: Frontier (local) / Verizon (long distance) at Koppers site

• Trimodal parcel: Frontier & Comcast; fiber available to site

• Broadband connectivity supports industrial controls and data infrastructure buildout

Natural Gas Infrastructure

• On-site pipeline: Direct Energy / Mountaineer Gas Company

• 6-inch gas main, 156 ft to plant, pressure: 38 PSIG (Koppers site)

• 3-inch line on Trimodal parcel; estimated load: 100,000 cubic feet per hour

• Natural gas supplies ~89% of annual boiler fuel input; remainder from process solvent 

Environmental Next Steps

• The Koppers / Trimodal assemblage supports phased development, leveraging existing infrastructure and ongoing environmental and permitting activities. The Trimodal parcel has received a WVDEP Certificate of Completion under the Voluntary Remediation Program.

• Conceptual Environmental Desktop Review available

• The site is located in a federally designated Opportunity Zone, offering significant tax incentives for qualified investors

• Brownfield designation provides opportunities for remediation incentives and streamlined development pathways